Whether you choose professional installation or a plug-and-play kit, day-one preparation saves time.
Before arrival
Confirm zone layout, water source access, power locations, and network availability. Label beds or benches to match portal zones.
During installation
Technicians mount controllers, connect sensors, and validate each line before commissioning. Quick connectors speed testing and future changes.
After handoff
You should leave with portal access, labeled zones, and a basic understanding of manual overrides. Keep run logs for the first week to validate automation behavior.
Installation services are available, as are plug-and-play versions with quick connectors.